|
| |

PO.Box 205 - Cumana -
Estado SUCRE = Vía Cariaco / Los Cachicatos - Araya Península - V E N E Z U E L
A
=
RATES & TARIFFS =
= TARIFS =
CATAMARAN & MONOHULL,
Including 5 days hard standing, Minimum Bill: 33 feet.
CATAMARAN & MONOCOQUE, 5 jours gratuits, Facturation mini: 33 pieds.
|
ENGLISH |
FRANÇAIS |
MONO |
CATAMARAN |
Per / Par: |
|
BSF |
BSF |
|
Haul out & launch: |
Sortie & rentrée: |
20,00 |
20,00 |
Foot |
|
High-pressure wash: |
Lavage haute pression: |
5,00 |
10,00 |
Foot |
|
Chocking, water and electrical connections: |
Supports & Connections Electriques & Eau: |
2,50 |
1,50 |
Foot |
|
Live on board (LOB): |
Vie a Bord (LOB): |
1,50 |
1,50 |
Foot / Day |
|
Long term storage (STO): |
Stationnement Longue durée (STO): |
0,90 |
0,90 |
Foot / Day |
|
Anti Fouling special (*): |
Forfait Anti-Fouling (*): |
45,00 |
67,50 |
Foot |
|
Water & Electricity: |
Eau & Electricité: |
5,00 |
5,00 |
Day |
|
Electricity for AC: |
Electricité pour Air Conditionné: |
7,50 |
7,50 |
Day |
|
Casual labor hour: |
Main d’oeuvre normale heure: |
25,00 |
25,00 |
Hour |
|
Casual labor day: |
Main d’oeuvre normale jour: |
150,00 |
150,00 |
Day |
|
Professional labor hour: |
Main d’oeuvre spécialisée heure: |
80,00 |
80,00 |
Hour |
|
Professional labor day: |
Main d’oeuvre spécialisée jour: |
480,00 |
480,00 |
Day |
|
Double rooms with bathroom, air conditioning: |
Chambre double, salle de bain, AC:
|
185,00 |
185,00 |
Day |
|
MAP, Modified American Plan / person: |
1/2 Pension / personne: |
160,00 |
160,00 |
Day |
(*)
Haul out & Launch, High-pressure wash, Chocking, Sanding, 2 coats of antifouling
(paint not included)
7
days on the hard (LOB):
(*)
Sortie & Rentrée, Lavage Haute pression, support, ponçage, deux couches,
(peinture non comprise)
7
jours a sec (LOB):
|
EXAMPLE, PRICE for a 40
feet boat: |
MONO |
CATAMARAN |
Per / Par: |
|
EXEMPLE, PRIX pour un
bateau de 40 pieds: |
BSF |
BSF |
|
Haul out & launch + High-pressure wash +
Chocking + 5 days hard standing: |
1100,00 |
1260,00 |
Package |
|
Sortie & rentrée + Lavage haute pression + supports & connections + 5 jours
a terre: |
Paquet |
All
prices excluded VAT – 9%
All
payments are in Venezuelan Bolivar.
Our
prices in BsF.
are modifiable at any moment.
Non inclus : T.V.A.
9%
Suivant la loi Vénézuélienne, nos factures sont éditées en Bolivar.
Nos prix en BsF.
sont modifiables à tout moment.

|